Skip to main content
Version: 0.6.3 · Archived

AI Engineering & Construction

ClaudusBridge includes an engineering system for professional construction workflows. The AI builds structures piece by piece, inspecting each step — exactly like a real engineer on a construction site.


Philosophy​

The AI should never spawn entire buildings at once. It surveys the terrain, plans the structure, places each piece individually, verifies alignment, and audits the result. This is a delicate process — engineering firms will use this for real architectural projects.


Engineering Actions​

All actions are accessed through the ai_engineer tool:

ActionDescription
surveyInspect terrain at coordinates — returns ground height, slope, nearby actors
placePlace a building piece with validation (door width, stair rise/run, bounds check)
verifyNavigate to a placed piece and inspect it visually
auditFull structural audit — errors, warnings, piece inventory, total bounds
demolishRemove a specific piece by its label
clearRemove all pieces matching a prefix (e.g., clear all "H_" pieces)

Construction Workflow​

Phase 1: Site Survey​

# Survey the build location
curl -X POST http://localhost:3000/mcp \
-d '{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{
"name":"ai_engineer","arguments":{"action":"survey","x":0,"y":0}}}'

Evaluate the terrain: is it flat? Are there obstacles? What's the ground height?

Phase 2: Foundation​

Place the foundation slab first — this is the base everything sits on.

curl -X POST http://localhost:3000/mcp \
-d '{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{
"name":"ai_engineer","arguments":{
"action":"place","type":"cube","label":"Foundation",
"x":0,"y":0,"z":0,"scale_x":12,"scale_y":10,"scale_z":0.3}}}'

Capture and verify before proceeding.

Phase 3: Structural Elements​

Build in order:

  1. Pilares (structural columns) at corners and load-bearing points
  2. Muros exteriores (exterior walls) — pared por pared
  3. Divisiones interiores (interior walls) — creating rooms
  4. Huecos for doors and windows — proper dimensions

Phase 4: Openings​

Real-world window dimensions:

  • Window: starts ~90cm from floor, ~120cm tall, ~100-150cm wide
  • Door: starts at floor level, ~200cm tall, ~90cm wide
  • Garage door: ~250cm tall, ~300cm wide

Phase 5: Second Floor (if applicable)​

  1. Place floor slab on top of first floor walls
  2. Repeat pilares, muros, divisiones for second floor
  3. Verify structural alignment with first floor

Phase 6: Roof​

Options:

  • Flat roof (simple slab)
  • Gable roof (two angled slabs meeting at ridge)
  • Hip roof (four angled faces)

Phase 7: Audit​

curl -X POST http://localhost:3000/mcp \
-d '{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{
"name":"ai_engineer","arguments":{"action":"audit","prefix":"H_"}}}'

Inspection Protocol​

After placing EVERY piece:

  1. Navigate to inspection position (smooth movement)
  2. Capture the editor view
  3. Read the image — actually look at it
  4. Evaluate — is the piece correctly positioned? Right size? Aligned?
  5. Fix if needed (demolish and re-place)
  6. Proceed to next piece only after verification

Demolition​

Remove a specific piece​

curl -X POST http://localhost:3000/mcp \
-d '{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{
"name":"ai_engineer","arguments":{"action":"demolish","label":"H_Wall_Left"}}}'

Clear all pieces with a prefix​

curl -X POST http://localhost:3000/mcp \
-d '{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{
"name":"ai_engineer","arguments":{"action":"clear","prefix":"H_"}}}'

Best Practices​

  • Always survey before building — know the terrain
  • Build foundation first — everything depends on it
  • One piece at a time — never batch-spawn entire structures
  • Verify every piece — capture and visually inspect after each placement
  • Use real-world proportions — walls 300cm tall, doors 200cm, windows start at 90cm
  • Audit periodically — check structural integrity during construction
  • Name pieces consistently — use prefixes like H_ for easy management